Stamping Press Preventive Maintenance

Preventive Maintenance (PM)

  • Requires everyone in the organization to make sure equipment is working efficiently.
  • Total personnel involvement means everyone working together as a team.

Why is Preventive Maintenance (PM) Necessary?

  • Reducing downtime (planned and unplanned)
  • Improved quality production
  • Increasing machine efficiency
  • Lower cost for maintenance and materials
  • Gain a competitive advantage over competitors

The PM inspection encompasses all components of the press:

  • Machine level
  • Parallelism
  • Perpendicularity
  • Overall Bearing Clearances
  • Slide Guiding Systems (gibs and counterbalances)
  • Clutch and Brake System (stopping time)
  • Pneumatic, Hydraulic, Electrical, and Lubrication Systems

Block times for press inspections:

  • Transfer presses (two days, two men, 32-36 hrs)
  • Progressive-straight side (one day, two men,16-18 hrs)
  • Gap frame (half day, one man, 4 hours)

Through experience and professional record keeping we can keep your inspection cost to a minimum, provide valuable feedback about action items for your equipment and give you an easy to read overview of overall press condition.

Don't wait for an emergency or machine malfunction - REACT TODAY - CONTACT AIDA AMS

Contact AIDA We will reply to you quickly
  Contact Name:
  Company Name:
   State / Country:
  Email:
  Tel:
  Area of Interest:
Please send future emails from AIDA:
Yes No
*Required. For quality and efficiency purposes,   please take care with information accuracy.

*For security purposes, javascript is required to process this form. If you see this message, you have javascript disabled. Please enable javascript in your browser to use our contact form.

If you are unable to enable javascript in your browser, please contact us directly using the contact information located here:
www.aida-global.com/contact.cfm

Thank you for your understanding.

"The NSU's bed size and load capacity made it possible for us to build new stamping dies that eliminate the need for secondary operations."

Brian Boeck
Manufacturing Engineer for Bradley

Bradley Testimonial | PDF

"With the NSU's superior performance we were able to schedule more dies to run across the press than we had originally anticipated."

Marvin Otto
Production Manager, C.H.I.

C.H.I. Testimonial | PDF

"With the [AIDA] gap frame presses, we found we didn't have to restrict ourselves on the width of material we ran."

Rick Baltz
Production Manager for E-lite

E-Lite Testimonial | PDF

"With just one press able to handle the larger dies, we knew if we experienced a breakdown we would be facing a serious work stoppage with downtime of two to three weeks. AIDA's NST solved our capacity issues."

Don Ried
Manufacturing Engineer for Empire

Empire Testimonial | PDF

"We're able to run the smallest possible batches, minimizing working capital, inventory, and floor space requirements while optimizing flexibility, cycle times, and capacity."

Rick Thompson
Senior Director for Flextronics' Juárez Operations

Flextronics Testimonial | PDF

"We selected AIDA's Access control to work with the PMX. AIDA customized our control layout to meet the special needs we had in the pressroom."

Lawrence Toboyek
Manager of Maintenance and Tooling for Greenheck

Greenheck Testimonial | PDF

"When we began running production on the PMX, we saw production rates we had never seen before."

Tom Kacmarcik
President of Manufacturing of Kapco

Kapco Testimonial | PDF

"Not only are we supplying our customers parts with greater efficiency, the ability to use nontraditional die technology gives us, our customers, and our prospective customers more manufacturing options."

Gary Wenzel
Vice President of Manufacturing for Luitink

Luitink Testimonial | PDF

"The TMX literally allowed Midwest to move into the electronic age."

Ken Freeman
Corporation Tooling Manager for Midwest Stamping

Midwest Testimonial | PDF

"The [AIDA] lines run 24 hours a day, five and a half days a week, and we've experienced no downtime with the presses."

John Olson
Senior Automation Engineer for
Milwaukee Electric Tool Corporation

Milwaukee Testimonial | PDF

"We wanted a system that could not only produce the part but support our just-in-time initiatives by helping us to further reduce inventory, lead times and the cost and maintenance associated with progressive dies."

Richard Engasser
Production Manager, Newman Technologies S.C.

Newman Testimonial | PDF

"We wanted to create a state-of-the-art stamping shop that would meet our current needs and possess the capability to take us a step further,"

Corey Suthers
President of Norlen, Incorporated

Norlen Testimonial | PDF

"We needed a press that could produce a variety of stampings ranging from high volume, thick progressive die parts to large, lower volume, highly cosmetic pieces."

Jason Nelson
Manufacturing Engineer for Polaris

Polaris Testimonial | PDF

"Since we've had these presses, our improvement in uptime has been dramatic. And for a job shop, that's the bottom line, because downtime isn't an option."

Trent Jensen
General Manager For Tenere Dresser Division

Tenere Testimonial | PDF

"We could have considered a conventional press line for this job but the manufacturing cell we created by selecting a transfer line of four AIDA 250-ton gap presses armed with ServoPro allowed us to invest in our future."

Tom Ward
Vice President, Ward Manufacturing Company

Ward MFG Testimonial | PDF